Home › Knowledge base › Getting started and handover
Getting started and handover
Handover from the developer, your property and the survey · 10 articles
Nothing found. Try another word or open a category:
- Getting started and handover
- Stages and checking the work
- Budget and money
- Documents and warranties
- Team and roles
- Doma app: how to use it
- Login and plans
Couldn't find an answer? Write to us
- New-build apartment handover inspection: a checklistWhat to check when you accept an apartment from the developer: 17 items in order, from the inspection and defect list to a follow-up, the certificate and keys.
- Demolition in a renovation: what to remove and what to keepOnly what the design says comes out: non-load-bearing partitions, weak plaster, unneeded wiring. What not to touch without approval and how to accept the stage.
- Property and survey: how to create a property and set up your renovation routeHow to choose a property type and role, complete the survey so the app builds your renovation route, add a second property and change its name and address.
- Planning an apartment renovation: what to decide before work startsWhat to decide before contractors arrive: goal and budget, measurements, layout and furniture, kitchen, building systems, lighting, long-lead orders.
- Accepting a finished flat from the developer: what to check beyond the usualA flat with finishes: besides windows, walls and meters, check the floor, tiles, doors, plumbing and every socket. What to bring and how to record defects.
- Renovating a private house: the order from roof to facadeInspection, then roof, water, power and heating, then finishing: it starts once the house is protected from water. The stage order and what to start early.
- Office renovation: stages, low-voltage systems and fire safetyAn office is renovated under the landlord's and business centre's rules: approvals, network and fire alarm before the ceiling, testing, the move.
- Renovating a resale flat: what to check and where to startYou bought a resale flat: what to inspect before renovating, when to replace risers, wiring and the panel, who handles gas, and the order of work.
- Where to start renovating a new-build apartment: first steps after you get the keysGot the keys to a new build: handover and defects, meter readings, planning, the order of renovation stages and what to order early so work doesn't stall.
- Defects at apartment handover: how to record them and what to do nextHow to record defects at a new-build inspection: one list with photos, handing it to the developer, a follow-up inspection, the certificate and the law.
Couldn't find an answer? Write to us
